Ensuring community safety through professional powerline clearance, protecting 87 households from electrical hazards while maintaining reliable power supply.

5 Days
Project Duration
2.3km
Corridor Cleared
87
Homes Protected
100%
Safety Compliance

Project Overview

The Swan Valley Residents Association contacted Hills Tree Solutions regarding critical electrical safety concerns affecting their entire community. Multiple mature eucalyptus trees had grown dangerously close to 11kV powerlines, creating immediate fire risks and potential community-wide power outages.

Location:
Residential Community, Swan Valley
Client:
Swan Valley Residents Association
Completed:
June 2024
Duration:
5 Days
Area Cleared:
2.3km of powerline corridor cleared
Investment:
$12,500

Critical Safety Challenges

High-voltage electrical hazards requiring specialized expertise and strict safety protocols to protect community infrastructure.

High-Risk Electrical Hazards Identified

Multiple mature eucalyptus trees growing dangerously close to 11kV powerlines
High voltage electrical hazards requiring specialized safety protocols
Community-wide power outage risks during Perth summer storm season
Limited access through residential backyards and narrow easements
Coordination with Western Power for safe isolation procedures
Minimizing disruption to 87 households during essential work
Environmental protection requirements for native vegetation
Strict compliance with AS4373 powerline clearance standards

Professional Safety Process

Systematic electrical safety approach ensuring AS4373 compliance and zero incidents throughout community-wide clearance operations.

1

Electrical Safety Assessment & Western Power Liaison

Comprehensive hazard identification and coordination with Western Power for safe work procedures

Duration: 1 full day
  • Conducted detailed electrical hazard assessment of 2.3km corridor
  • Liaised with Western Power for isolation schedules and safety requirements
  • Identified high-risk trees and immediate safety concerns
  • Mapped all overhead and underground utilities in work areas
  • Established exclusion zones and safety protocols for each location
  • Coordinated with local council for heritage tree assessments
2

Community Consultation & Access Planning

Comprehensive community engagement and detailed access route planning for minimal disruption

Duration: 2 days
  • Door-to-door consultation with all 87 affected households
  • Provided detailed work schedules and safety information
  • Arranged alternative access routes through private properties
  • Coordinated timing to minimize impact on daily routines
  • Established emergency contact protocols for residents
  • Set up temporary parking arrangements for displaced vehicles
3

Systematic Vegetation Clearance

Professional powerline clearance following AS4373 standards with continuous safety monitoring

Duration: 3 full days
  • Maintained minimum 3-meter clearance from 11kV conductors
  • Used specialized insulated tools and equipment throughout
  • Implemented continuous electrical safety monitoring protocols
  • Processed vegetation using controlled lowering techniques
  • Maintained emergency response readiness at all times
  • Documented compliance with photographic evidence
4

Site Restoration & Community Completion

Thorough cleanup, site restoration, and final community consultation to ensure satisfaction

Duration: 1 full day
  • Removed all vegetation debris from residential properties
  • Restored damaged lawn areas and garden access paths
  • Provided premium mulch to interested residents from processed vegetation
  • Conducted final safety inspection with Western Power representative
  • Delivered compliance certificates to community association
  • Followed up with residents to ensure complete satisfaction

Outstanding Safety Results

Complete electrical safety transformation delivering immediate risk elimination and long-term community protection.

Of powerline corridor safely cleared to AS4373 standards icon
2.3km

Of powerline corridor safely cleared to AS4373 standards

Protected from electrical hazards and power outage risks icon
87 Homes

Protected from electrical hazards and power outage risks

Compliance with Western Power and AS4373 safety standards icon
100%

Compliance with Western Power and AS4373 safety standards

Safely pruned while preserving community canopy coverage icon
15 Trees

Safely pruned while preserving community canopy coverage

Safety Protocol Framework

Comprehensive safety management ensuring zero incidents and full regulatory compliance throughout electrical infrastructure work.

Electrical Isolation Procedures

Coordinated with Western Power for systematic isolation of conductors where required, with continuous monitoring and verification of electrical safety throughout all operations

AS4373 Compliance Standards

Maintained minimum 3-meter clearance zones around 11kV conductors, with additional safety margins for future growth and weather movement considerations

Specialized Equipment Requirements

Used only insulated tools rated for electrical work, specialized non-conductive ropes, and maintained minimum approach distances at all times during operations

Emergency Response Preparedness

Maintained direct communication with Western Power control room, emergency services on standby, and immediate medical response protocols for any electrical incidents

Weather Monitoring Systems

Continuous monitoring of wind conditions, humidity levels, and storm activity to ensure safe working conditions and immediate work cessation protocols if required

Community Safety Measures

Established safety perimeters, resident notification systems, and alternative access routes to ensure community safety throughout the duration of works

Safety Transformation

See how professional powerline clearance eliminated critical electrical hazards for an entire Perth community.

Before

High-risk electrical hazards threatening community safety

  • 15 mature trees with branches touching 11kV powerlines
  • Immediate risk of electrical fires during summer storms
  • Potential community-wide power outages affecting 87 homes
  • Non-compliance with mandatory AS4373 clearance standards
  • Insurance liability concerns for affected residents
  • Emergency services access hindered by vegetation overgrowth
  • Ongoing maintenance access problems for Western Power crews

After

Electrically safe community with reliable power supply

  • Full AS4373 compliance with 3+ meter safety clearances maintained
  • Eliminated fire risks and electrical hazards for entire community
  • Reliable power supply protected against weather-related outages
  • Clear emergency services access throughout residential area
  • Enhanced property values through improved safety compliance
  • Ongoing Western Power maintenance access restored
  • Community peace of mind with professional safety certification

Community Impact Analysis

Quantified benefits delivering lasting value and peace of mind for 87 households across the Swan Valley community.

Enhanced Safety

Eliminated immediate electrical fire risks and potential electrocution hazards for entire community

87 families protected

Reliable Power Supply

Prevented weather-related power outages that previously affected the community during storms

87 properties secured

Insurance Compliance

Ensured all properties meet insurance requirements for electrical safety and fire prevention

87 policies protected

Property Values

Enhanced property marketability through demonstrated safety compliance and infrastructure maintenance

87 investments secured
"Hills Tree Solutions delivered exceptional service for our entire community. Their professional approach to powerline safety, coordination with Western Power, and consideration for residents was outstanding. We now have peace of mind knowing our electrical infrastructure is safe and compliant."
Margaret Thompson
President, Swan Valley Residents Association

Regulatory Compliance Standards

Full compliance with all Australian standards and Western Power requirements ensuring legal protection and professional certification.

Standard/RegulationRequirementCompliance Status
AS4373-2007Pruning of amenity trees in the vicinity of powerlines
Full compliance with minimum clearance distances and approved pruning techniques
Western Power Technical RulesWork near electrical infrastructure safety protocols
Pre-approved contractor with current electrical safety certifications
WorkSafe WA RegulationsHigh-risk construction work safety management
Comprehensive safety management plan and qualified electrical workers
Environmental Protection AuthorityNative vegetation clearing permits and protection
Selective pruning minimizing environmental impact with EPA approval

Protect Your Community Today